Deployment Spooler

 

Our patented Deployment Spooler allows us to remove the entire tubing system, pump and motor from the well, switch out either the pump or motor or both and re-install the entire tubing system within 45 minutes.

On a traditional rod pump system this would require a workover rig and crew to remove all the rods and tubing to replace the pump, normally a one to two day process.

Our Deployment Spooler is able to be transported behind a full size pickup truck and reach remote wells in inclement weather on muddy roads, which is very difficult and sometimes impossible with a large workover rig.

 

Login

Search